Table of Contents

Released Production Order

Released production orders are the document for production orders to be carried out. You can control production from here. This page is from the Business Central standard, but some fields have been added with the SIEVERS WMS.

  • Actions
    • Check Production Supply: Opens a window in which you can manually create replenishment for production orders. The current production order is preset as the filter. See Check Production Supply.
    • Log Replenishment creation: Shows the log with the created replenishment move jobs with a lot of information. In addition, the created move order can be opened.
    • Open Production Supply Move Job: Opens the related production supply move job, if one exists.
  • Order
    • Finish Products: Combines the actions Post Output and Post Consumption. If you use this function, posted consumption will always match the completed quantity. Input the quantity to post. You can also find this action on the list of the released production orders. You can also use this action to complete scrap quantities. These are finished but unusable products. The material consumption is deducted as normal, but the products are not posted to stock. If the Scrap Code Necessary field is activated in the SIEVERS WMS Setup, a scrap code must be specified for scrap quantities. You cannot post scrap and finished products at the same time. If the SIEVERS WMS Setup setting Auto Print LC on Output is enabled, the load carrier label is printed without further notification.
  • Output
    • Create Output Journal: Create a new output journal with the production order number and insert the finished products from the order into the journal sheet.
    • Delete Output Journal
    • Open Output Journal
    • Post Output: Automatically posts the in the form entered quantity via output journal. The process creates an output journal, creates a Inbound Stock Post order, determines a storage place and posts the Inbound Stock Post document to the output journal. This action is also located in the lines menu so you can also post selected lines. You can also use this action to complete scrap quantities. These are finished but unusable products. You cannot post scrap and finished products at the same time. If the Scrap Code Necessary field is activated in the SIEVERS WMS Setup, a scrap code must be specified for scrap quantities. The scrap is not posted with a stock effect. If the SIEVERS WMS Setup setting Auto Print LC on Output is enabled, the load carrier label is printed without further notification.
  • Consumption
    • Create Consumption Journal
    • Delete Consumption Journal
    • Open Consumption Journal
    • Post Consumption

General

  • Replenishment Status

Lines

  • Replenishment Status
  • Storage Place Finished Products
  • Inbound Stock Post Strategy Code Finished Products

SIEVERS WMS

  • Location Code Production
  • Output Journal Exists
  • Consumption Journal Exists
  • Provisioning of Components
    • Storage Place Code Components
    • Replenishment Strategy Code Components
    • Inv. Sel. Strategy Code Components
    • Provisioning Strategy Code Components
  • Output of finished products
    • Inbound Stock Post Strategy Code Finished Products
    • Storage Place Code Finished Products
Hinweis

Changes to the Provision of Components fields can be transferred to the component lines after a query. The information in the above fields is transferred from the SIEVERS WMS setup when the production order is created. If the production order is updated, the information is transferred according by the following hierarchy:

  1. Work center/work center group (only if a routing link code is stored in the prod. order component line)
  2. Stockkeeping unit
  3. Item
  4. Item category
  5. Production order header

If no information is found in the first level, the next level is taken.

Prod. Order Components

In the lines of the released production order, you can also access the components of the respective production order line. Doing so opens this page. This is a table from the Business Central standard, but it has been extended by additional fields from the SIEVERS WMS.

The following fields have been added:

Menu:

Table:

  • Number of Pieces in Prod. Area: Specifies the number of pieces of all inventories of the item that are in the production area. Reservations are not taken into account.
  • Overall Remaining Quantity: Specifies the total quantity remaining of all released production order component lines that refer to the same combination of item number and variant.
  • Overall Remaining Quantity (SP): Specifies the total remaining quantity of all released production order component lines that refer to the same combination of item number, variant, and storage place components.
  • Inventory selection
  • Quantity consumption journal
  • Quantity replenishment
  • Replenishment Status
  • Replenishment Move Job Status: Indicates the state of the directly linked replenishment move job. Empty if no move job is linked.
  • Finished Replenishment Quantity: Indicates the quantity already processed in the linked production supply move order.
  • Storage Place Code Components
  • Replenishment Strategy Code Components
  • Inv. Sel. Strategy Code Components
  • Provisioning Strategy Code Components
  • Supply class production
  • Routing link code
Hinweis

If a consumption journal already exists for a production order, the fields Location code and Inventory Selection Strategy Components in the corresponding component lines can no longer be changed.

Hinweis

Changing a machine center in a production order work plan causes some fields of the component lines with the same routing link code to be recalculated. The following fields are affected:

  • Storage Place Code Components
  • Replenishment Strategy Code Components
  • Inv. Sel. Strategy Code Components
  • Provisioning Strategy Code Components
  • Supply class production

Check Production Supply

With this action, you can generate replenishment for production orders. You can adjust the following parameters:

  • Calculation Formula for Lead Time: indicates which production orders should be included in the calculation. Here you can enter usual time specifications for Business Central, such as ‘2D’ (2 days). Based on this, the due date is calculated
  • Due date: The maximum due date of the included production orders
  • Replenishment Move Order Production per Target: Each component for production has a target to which it must be delivered. This target can come from the production order, the item or the workstation, for example. This parameter ensures that only components that have to be brought to the same place are determined with this replenishment move order.
  • Details: If this option is activated, the log replenishment creation is opened with a filter for the created move order after the move order has been created, so that you can track the created movements.
  • WMS Teams: Activates the team-based grouping of move jobs. When activated, all other grouping options are deactivated. The move job creation follows this logic:
    • Primary grouping: Internal Transport Team from SNCL Move Job
    • Secondary grouping: Internal Transport Follow-up Team from SNCL Move Job
    • Per move job, only lines with an identical team combination are consolidated

If not enough inventory can be found for the replenishment, no replenishment and thus no stock document is created.

To create replenishment, it is important that the following fields are filled in the component lines of the Released production order:

  • Location Code
  • Storage Place Code Components
  • Replenishment Strategy Code Components
  • Provisioning Strategy Code Components
Hinweis

Please note that no production locations are taken into account for this replenishment.

Log Production Supply

Shows the protocol of the task Production Storage Place Replenishment. For the respective lines, you can also open the move job.

  • Position No.
  • Item No.
  • Variant Code
  • Location Code
  • Warehouse Code
  • Storage Area
  • Storage Place Code
  • Production Order No.
  • Production Order Line No.
  • Status
  • Component Line No.
  • Source Table
  • Source Table Name
  • Needed Quantity (Base)
  • Source Quantity (Base)
  • Source Storage Place
  • Qty. in Prod. Storage Area
  • Replenishment Quantity
  • Considered Replenishment Quantity
  • Completed Replenishment Quantity
  • Free Quantity
  • Calculated Replenishment Quantity
  • Minimum Inventory
  • Maximum Inventory
  • Minimum Replenishment Quantity
  • Step Size
  • Quantity to Replenish (Base)
  • Inventory Target Storage Place
  • Reserved Inventory Target Storage Place
  • Inventory Addition to Target Storage Place
  • Total Inventory in Stock
  • Reserved Inventory
  • Blocked Inventory
  • Storage Place Search Filter
  • Provisioning Strategy Code Production
  • Replenishment Strategy Code Production
  • Move Job
  • Replenishment Move Job Manuf. per Target
  • Type of Production Supply: Indicates whether the replenishment was determined with a warehouse reference (Warehouse Reference), for a production order (Production Order Reference) or for a production storage place (Production Storage Place).
  • Replenishment Creation No.
  • Created at Date
  • Created at Time

Log Replenishment Creation

Displays the log for the replenishment created for the current released production order. You can also open the move order for the respective lines.

  • Item No.
  • Variant Code
  • Storage Location Code
  • Warehouse Code
  • Storage Area
  • Storage Place Code
  • Prod. Order No.
  • Prod. Order Line No.
  • Status
  • Component Line No.
  • Source Table
  • Source Table Name
  • Entry No.
  • Assigned Entry No.
  • Needed Quantity (Base)
  • Source Quantity (Base)
  • Source Storage Place
  • Minimum Inventory
  • Maximum Inventory
  • Minimum Replenishment Quantity
  • Step Size
  • Quantity to Replenish (Base)
  • Provisioning Strategy Code Production
  • Replenishment Strategy Code Production
  • Move Job
  • Replenishment Move Job Manuf. per Target
  • Type of Production Supply: Shows whether the replenishment has a warehouse reference or is assigned to a specific production order.
  • Replenishment Creation No.